Work with cards
Use the board
Move cards between statuses and arrange your project board to focus on current work.
Last updated
The board shows your cards in columns. Each column represents a status, so you can see where work stands at a glance.
See what needs attention#
Use the board during a team check-in. For example, look at In progress before starting more work, then check In review for cards waiting on another person.
Work with columns and cards#
- Open a project and choose Board from the view menu.
- Find a card in its status column. Click the card to open its details.
- Drag a card into another column to change its status. You can also open the card and use its Status picker.
- Open Display options to choose ordering. Manual lets you arrange cards by dragging. Priority, Last updated, and Created give you other ways to order them.
- Use Filters to narrow the board to a person, priority, label, or another available field. Clear filters when you want the full board again.
Tips and common mistakes#
- A filtered board shows part of the project. If a card seems missing, check the applied filters and whether sub-tasks are shown.
- You can move a card with the keyboard: focus it, press
Space, use the arrow keys, then pressSpaceorEnterto drop it.Escapecancels the move. - Left and right arrows move a picked-up card between columns. Up and down move it within a column.
- A project can require unfinished criteria to be resolved before a card reaches Done. Read the message shown if a move needs attention.